Shift Summary Day 1/27/00


Subject: Shift Summary Day 1/27/00
From: Vivian O'Dell (odell@fnal.gov)
Date: Fri Feb 04 2000 - 15:42:29 CST


Shift summary/ Day 1/27/00

 07:20 GB does walkthrough a day early. Chiller OK

 07:50 RP does walkthrough 30 mins late. Chiller OK. Get
           key for downstairs after calling control room

 11:35 RP does walkthrough and gas check. JRL and JH working.
 
 14:00 LN attempted to turn heat on in the bathrooms. Smoke. A
technician
           came and found a bunch of leaves in the duct against the
heating cells.
           These are being cleaned out - the evidence is on the floor.
  
 15:00 RP does walkthrough. chiller is on. Jasons tell her the story
of the leaves.



This archive was generated by hypermail 2b27 : Fri Feb 04 2000 - 15:42:31 CST