Shift Summary/ Evening 1-26-00


Subject: Shift Summary/ Evening 1-26-00
From: Vivian O'Dell (odell@fnal.gov)
Date: Fri Feb 04 2000 - 15:41:53 CST


 
 Shift summary/ Evening shift 1-26-00
 
 15:30 Last Shift walkthrough complete so I wait until the next
           period ( ~7PM) to investigate.
 
 19:55 Walkthrough Complete. All OK
           Gas Checklist complete, Called MCR to access a key for the hall
           Conferred with the MCR about kepping the doors to the dowstairs
           locked at all times. No one confirmed that, so I put the
           appliance on the latch and locked the outside building doors,
           and returned the key to the locked key tree.

 22:19 Walkthrough. All OK
             Locked up the outside accesses to the building. Placed sign on
              the south outside door. Do not get locked out of the
              building on a cold night checking the gas!

  23:59 Walkthrough complete. No events

 
Fini
 
 



This archive was generated by hypermail 2b27 : Fri Feb 04 2000 - 15:41:55 CST