Shift summary for eve 12/30/99

Jason Hamm (jhamm@physics.arizona.edu)
Fri, 31 Dec 1999 11:46:12 -0700 (MST)

Sorry-this didn't get sent correctly last night.

Shift Summary for eve shift, 12/30/99

On Shift: J. Hamm

Tapes brought to FCC this shift:

UP(A,B,C)289-291, UPS097
UPK037-038, UPLA14, UPCR06, UPF070-072, UPT023-024, UPPE11,
UPMU06, UPLS03, UPH053, UPE020, UPX019, UPM052-053
========================================================================
Accesses during shift: open access
========================================================================
Overview of shift: lots of tinkering at start of scheduled downtime
========================================================================
Description of Shift:

run spill time comment
------------------------------------------------------------------------
15:30 JRL takes fruit out of readout and powers off
fastbus (CAMAC crates in these racks still on).

18:25 SL changes DYC delay time for FERA ADC crates
11 & 12 from 2 to 8 microseconds.

19:30 RK unplugs BA3 sources at RR92 in preparation for
quartz test; also zeros BA3 HV.

21:15 All modules in crate 8 were moved to different
slots (see new assigments in logbook XXIII.160)
Claim made that crate 8 is now working OK.

22:30 AZTEC 2Y busy is stuck, even though fastbus is
off. RK unplugs it from 4616 module.

0:00 JCH turns off ET & ET water cooling, christmas
lights.