EVE shift, 24 June 1999

Leo Bellantoni (bellanto@fnpxsr)
Thu, 24 Jun 1999 23:52:34 CDT

Shift Summary for EVE shift, 24/Jun/99

On Shift:
Leo Bellantoni, Albert Erwin

Hours of beam delivered at all intensities: 0.0
Hours of beam delivered at nominal intensity: 0.0
Hours of E799 data (special runs not included): 0.0
Hours of special runs (laser scans, muon runs...): 0.0

Accounting of lost time:
No beam.

========================================================================
Runs ended this shift:
None

Tapes brought to FCC this shift: KQ1001, ...
(including tapes for online split)
None

========================================================================
Accesses during shift:
None

========================================================================
Overview of shift:
Sounds like they are pretty busy over in the MCR. At 11PM, preparing
for access to TeVatron; the fridge in A4 is not cooling down adequately,
and the vacuum doesn't look good there.

========================================================================
Description of Shift:

run spill time comment
------------------------------------------------------------------------
around 18:00 Rick K created BEAM_832_TEST, in which East-West
Up-Down logic is removed. This is to study
the problem with beam shapes in charged mode.
This configuration will have a high dead time.

========================================================================
Follow up Notes on Previous Shift
None

========================================================================
Items to Follow up on Next Shift

When beam comes on (if it is tonight):
(1) take a muon run and ramp up NM4AN (ie, no polarity flips)
(2) ramp up and run in BEAM_832_TEST till morning.
(3) Rick Coleman may want to do some beam studies.