Shift Summary for day shift, 05/28/97

On Shift: Brad Cox, Ron Ray, Doug Jenson

Hours of beam delivered at all intensities: 0
Hours of beam delivered at nominal intensity: 0
Hours of 99 data (special runs not included): 0
Hours of special runs (laser scans, muon runs...): 0.5 hr

Accounting of lost time:

DC4 oscillation fixed

BA offsets adjuste3d by Sasha L., Arun, Valeri Jejer, Sasha Golossanov

Crate 16 Branch 2 turned off due to worry about possible burning smell.

Swapped dpmt for CsI channel 206

The Bry-Air AC unit is down and waiting for repairs. CsI low voltage is
off.

Crate 4-51 gives illegal module number errors. Latch words screwed up.
R. Kessler removes cables from latches in slots 12 and 13.
No errors in Run 13180 following this.

Updated database banks ZPGM and DCGM based on 5/5/99 survey numbers for all
runs 13184.

========================================================================
Runs ended this shift:
Run 13170 - ped run
Run 13171 - Cosmic run
Run 13180 - Ped Run

Tapes brought to FCC this shift: 0

========================================================================
Accesses during shift: access the whole shift

=======================================================================